Plumbing Permits in Manhattan, New York
4,131 plumbing permits filed recently
4,131 permits
Herewith filing to modify the plumbing and sprinkler fixtures. No change to use, egress, or occupancy.
Application filed for plumbing additions/modifications on the 15th floor (techno) as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.
Proposed plumbing work associated with the modification. No change in Use, Egress, or Occupancy is proposed in this application.
New Sink/hwh, SP modification
Plumbing and sprinkler work in conjunction with Alteration Type I gut reno/enlargement. No change to use, egress or occupancy under this PL/SPK application.
Plumbing work in conjunction with the architectural alteration m00873134-i1. no change in use, occupancy or egress
Plumbing work as shown on plans (Penthouse 26 / PH 26).
Plumbing fixture installation at the cellar and first floor.
At 5th floor tenant space, additions/modifications to plumbing system including new fixturesd and related piping as per plans filed herewith. no change in use, occupancy or means of egress.
Plumbing modifications taking place on 1st and 2nd floors as per plans filed herewith. no change in use, egress, or occupancy.
Cap and remove 1 electric range, 1 sink, 1 tub, 1 lav, 1 wc to resolve violation # 35485319H.
Gas to gas replacement . reconnect existing gas line to replacement burner and replace gas train .
Subsequent filing for plumbing work on cellar, 1st thru 3rd floors, in conjunction with alt1 application #m00814190-i1.
Replacement of two fixtures in the existing bathroom. Installation of a three-compartment sink and a grease trap. Connection of espresso, ice machine and a hand wash sink. NO GAS WORK, NO SPRINKLER WO...
Plumbing modifications taking place on floor 001 as per plans filed herewith. No change in Use, Egress or Occupancy.
It is proposed to create a vanilla box for the new tenant, remove existing partitions, countertop, and plumbing fixtures to be removed under a separate LAA. No change of use, egress or occupancy.
Filing pl for installation of new plumbing fixtures
Removal of abandoned water tank and installation of plumbing fixtues in existing 6th floor stair bathroom/locker room. No change in occupancy, use or egress.
Replacement of existing kitchen and bathroom fixtures on existing rough-in and as required for accessibility upgrades in conjunction with work filed under separate architectural application. no change...