Plumbing Permits in Manhattan, New York
4,193 plumbing permits filed recently
4,193 permits
Herewith file plans for plumbing work associated with interior renovation of an existing apt unit 11a located on fifth floor. no change in egress, occupancy or use under this application.
Additions /Modification to existing Standpipe system /Sprinkler and Plumbing system as per plans filed herewith. Installation of new aux. fire hose cabinets & associated piping. No change in use, egre...
Proposed partial interior renovation of an existing 5 story brick building +bulkhead with cellar. plumbing works only. no change in bulk or in egress.
Plumbing work related to the interior renovation of apartment 9j on the 9th floor. no change in use, egress, or occupancy.
Plumbing scope of work is for kitchen gas shutoff valve. filed in conjunction with fdny fire surpression job # 2025-tmrghd-004512-plan. no change to use, egress or occupancy.
Plumbing fixtures instalation and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Pl work in apt 20mn filed in conjunction with dob now gc . no change to use, occupancy or egress.
Plumbing Modifications: Install (1) HWH, (1) Water Closet, (1) Lavatory, (1) Funnel drain and associated CW/Sanitary piping on the 10th Floor as per plans. (Hines - ADA Restrooms.) No change to use, e...
Application file to install plumbing fixtures at partial 1st floor for haagen-dazs ice cream store as per plan. construction work under separate application. no change in use, egress or occupancy unde...
Replace gas piping as per plans. no change in use, occupancy or egress.
Provide new plumbing fixtures for alterated commercial space as per plans filed herewith. no change in use, egress, or occupancy.
Herewith file to renovate exist. apartment unit #5k. work includes new/replaceplumbing fixtures with associated plumbing elements, and fire-stopping is provided. no change in use,egress, and occupancy
Heating plant upgrade and associated gas upgrade per plans submitted herewith. No change in use, egress or occupancy.
Plumbing work from the cellar, 2nd to the 6th floors as plans filed herewith. no change in use, egress, or occupancy.
Plumbing scope in conjuntion with interior renovation of apartment 12j as per plans filed herewith. no change in use, egress, or occupancy.
Install domestic water booster pump system.
Plumbing modifications as per plans. New fixtures and fittings.
Interior plumbing work on apartment 22fg as indicated on plans filed herewith.
Interior plumbing work as shown on filed plans
Additions /Modification to existing Standpipe system /Sprinkler and Plumbing system as per plans filed herewith. Installation of new aux. fire hose cabinets & associated piping. No change in use, egre...