Renovation Permits in Manhattan, New York
4,119 renovation permits filed recently
4,119 permits
Structural repairs and replacement as per plans, no change to use, egress or occupancy. full scope of work description in comments section.
Facade repairs as indicated on drawings.
Apartment renovation including interior renovation and minor facade scope as per plans filed herewith. no change to use, egress, nor occupancy. mh and pl to be filed as subsequent.
Interior renovation of unit #5C. Removal of existing & erection of new partitions, renovation of kitchen and bathrooms as per plans filed herewith. No exterior work. No change in use, egress or occupa...
Filing for Interior renovation and Combination of Apartments 3F and 3G on 3rd floor. The Proposed Combination of the two apartments is in compliance with TPPN 3/97 as per plans attached. No change to...
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress under this applicat...
Interior renovation filed in conjunction with dob now pl and mh. no change to use, occupancy or egress.
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
No change in egress, occupancy or use under this application, scope of work to include minor interior alteration to existing eating establishment, new finishes, new millwork counter, replace minor lig...
Minor interior partition removals and construction inconjunction with renovation of apartment #12b. renovate bathroom + kitchen. no change to use, occupancy or egress.
Equipment use: dual 7000 # capacity personnel hoists during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. ele...
Renovation of existing 10th floor apartment to include new partitions, relocation & replacement of fixtures in existing bathrooms & kitchen; new finishes & lighting throughout the apartment. No change...
Facade repairs as indicated on drawings.
Suspended scaffold installation for facade repairs and inspections
Suspended scaffold installation for facade repairs and inspections
Interior renovation of existing apartment 14D.No change in egress occupancy and use.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 14th fl as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work associated with the townhouse renovation, as shown on plans filed herewith. no change to use, egress or occupancy.
Filing interior renovation, removal and replacement of partitions and replace finishes as per plans filed. no change to use, egress or occupancy.
Partial renovation of the 25th floor and 24th floor. New partitions, doors and fixtures. No change to use, egress or occupancy.