Renovation Permits in Manhattan, New York
4,129 renovation permits filed recently
4,129 permits
Structural scope associated with the renovation of the terrace on the 21C/22M floor in compliance with the BB 2018-002. No change of use, egress or occupancy.
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATIONS AND CONVERSION FROM EXISTING COMMERCIAL BUILDING INTO A 8 FAMILY 4 STORY AND CELLAR RESIDENTIAL BUILDING. (All new interior finishing's & MEP, SP, P...
Remodel rear apt on basement level and relocate stairs to recreation room. no change in use, egress or occupancy.
Remodel rear apt on basement level and relocate stairs to recreation room. no change in use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 4th floor (corridor bathroom and freight lobby as per plans filed herewith. no change in...
Structural repairs located at the garage as indicated on plans. no change to occupancy, use or egress.
Interior renovation of existing apartment (#8W) on the 8th floor. No change to use, egress or occupancy.
Remodel apt 4c on the 3rd floor, apt 5a on the 4th floor and apt 6a on the 5th floor. no change in use, egress or occupancy.
Interior renovation including partition changes and new slab openings for vertical transportation systems. No change to use, egress, or occupancy.
General Construction work related to apartment renovation
Building 4: facade repairs to comply with ll/98. no change in use, egress or occupancy.
Filing herewith structural work in conjunction with building renovation as per plans.
Structural and foundation work in conjunction with alteration of existing 1-family dwelling
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 10th fl (apt 10ij) as per plans filed herewith. no change in use, egress, or occupancy.
HP SP: Modifications to ceilings and finishes to accommodate alterations for the sprinkler upgrades within the existing hospital building as per plans.
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Minor interior renovation to the first floor commercial store, including the installation of a new mechanical hood, ducts, and precipitator as per plan. no change in use, egress, or occupancy.
Filing herewith general construction to include interior renovation to existing apartment 7V as per plans submitted.
Cycle 9 fisp repairs and areaway repairs. no change in use, egress or occupancy.