Renovation Permits in Manhattan, New York
4,172 renovation permits filed recently
4,172 permits
Filing herewith interior renovation of existing apartments 8ORT, 3J, 4RT and 11K as per plans.
Structural and foundation work in conjunction with alteration of existing 1-family dwelling
Installation and use of temporary suspended scaffold for facade repairs as per plans filed herewith. no change to use, egress or occupancy under this application.
General Construction work related to apartment renovation
Modifications to existing Sprinkler/Standpipe system related to Kitchen and Restaurant renovation per plans.
Filing herewith structural work in conjunction with building renovation as per plans.
Herewith filing an application for the interior renovation of all apartments floors 001 through 006. existing fire rated partitions shall notbe altered. existing structural system shall not be altered...
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Herewith filing for interior renovation of exisitng apartment # 2 as per plans.no changes to use, egress or occupancy.
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application
Interior renovation: removal of gwb, flr, clg & wall finishes & light fixts. install new gwb, flr, clg & wall finishes. install replacement light fixts. no proposed change to use, egress or occupancy....
Minor interior renovation to the first floor commercial store, including the installation of a new mechanical hood, ducts, and precipitator as per plan. no change in use, egress, or occupancy.
Cycle 9 fisp repairs and areaway repairs. no change in use, egress or occupancy.
Foundation and earthwork work related to existing building alteration m01153426-i1.
Interior renovation including partition changes and new slab openings for vertical transportation systems. No change to use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 4th floor (corridor bathroom and freight lobby as per plans filed herewith. no change in...
Facade repairs, scaffold inspections, 3 men letter
Filing herewith general construction to include interior renovation to existing apartment 7V as per plans submitted.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 10th fl (apt 10ij) as per plans filed herewith. no change in use, egress, or occupancy.
HP SP: Modifications to ceilings and finishes to accommodate alterations for the sprinkler upgrades within the existing hospital building as per plans.