Building Permits in Manhattan, New York
24,739 recent building permits filed in Manhattan. Updated daily from public records.
24,739 permits
Interior renovation at 4th, 5th and 6th floor including installation of convenience stair between floors 4 and 5 floor, removing and installing new interior non-load bearing partitions, lighting and f...
Installation of suspended scaffold for facade work or inspection.
Illuminated non-advertising accessory sign - in property lines - new museum. no change of use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Hereby filing to install new streel framing for raised deck as shown on plans filed herewith. No change to use, occupancy or egress.
Removal of interior CMU wall for APT
INTERIOR RENOVATION AND CONVERSION OF OFFICE SPACE TO DAYCARE FACILITY. INSTALLATION OF NON-LOAD BEARING PARTITIONS, NEW FINISHES, NEW DOORS. INSTALLATION OF ASSOCIATED MECHANICAL EQUIPMENT TO ACCOMOD...
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work associated with the interior renovation of the kitchen area only in apartment #9a including modification of fixtures, drain, and water/ sanitary lines. no change to use, egress, or occup...
Sprinkler work on the 15th floor as plans filed herewith. no change in use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection
Filing herewith plumbing work to existing 7th floor space. No change in use, egress or occupancy.
install new whsp supporting heating and future tenant cooling and install hydronic heating system as per plans
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Application to renovate apt 212 with modification of the existing non bearing partitions with new finishes. No change to use, egress or occupancy under this filing.
Structural Work as shown on plans submitted herewith. No change to use, egress or occupancy as of right.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Minor interior demolition of existing office space including interior partitions, doors, suspended ceilings on Floors 9, 34, 35, 37, as per plans. No change to use, egress, or occupancy.
Filing for interior renovation of apt 4b as per plans submitted herewith.
MANHATTAN currently has 2,760 total permits on file with 2,180 new permits filed in just the last 30 days. That's serious construction activity. Other work leads the category with 1,405 permits, followed by renovation (378 permits), plumbing (366 permits), commercial (141 permits), and pool work (129 permits). For contractors hunting leads, this volume means steady opportunity. The money is concentrated in specific zip codes. 10022 leads with 250 permits, followed by 10001 (160 permits), 10019 (146 permits), 10017 (127 permits), and 10011 (125 permits). If you work in mechanical, electrical, plumbing, or general contracting, these neighborhoods are where permit activity clusters. Knowing where the work is filed helps you target bids efficiently. The average permit value in MANHATTAN is $311,849. That tells you the job sizes you're competing on. Most permits fall into the other and renovation categories, meaning property owners are doing full overhauls. Plumbing work is steady at 366 permits, so if you're in that trade, there's consistent opportunity. Contractors who monitor new permit filings can bid on jobs before competitors even know they exist. Our database updates daily from public records. The faster you see new permits, the better your chances of getting in front of property owners and GCs early. MANHATTAN's permit data shifts constantly, and staying current means you don't miss opportunities.
Frequently Asked Questions
How do I find new construction leads in MANHATTAN?
Monitor new permit filings daily. MANHATTAN averages 2,180 new permits filed every 30 days, so there's constant activity. Set up alerts for your trade and the zip codes where you work. When a permit is filed, you have a narrow window before other contractors see it. Check permits filed for the past 7 days first, then work backward. Property owners and GCs typically start calling subs within days of permit approval, so speed matters. Focus on zip codes 10022, 10001, and 10019 where permit volume is highest.
What are the most common permit types in MANHATTAN?
Other work dominates with 1,405 permits, which covers miscellaneous construction. After that, renovation comes in at 378 permits, plumbing at 366 permits, commercial at 141 permits, and pool work at 129 permits. If you're a plumber or HVAC contractor, renovation and other work categories are your biggest opportunity. If you're a general contractor, focus on renovation permits where you're likely to pull together a full team. The numbers show MANHATTAN is more renovation-heavy than new construction.
Which zip codes in MANHATTAN have the most building permits?
10022 has 250 permits, making it the most active by far. 10001 follows with 160 permits, 10019 with 146 permits, 10017 with 127 permits, and 10011 with 125 permits. These five zip codes account for the bulk of MANHATTAN permit activity. If you're deciding where to focus your outreach and networking, start here. Contractors who know the neighborhoods where work is happening can build better relationships with local GCs and property managers.
What is the average building permit value in MANHATTAN?
The average permit value in MANHATTAN is $311,849. That's a solid mid-to-large project size. This means if you're bidding, you're typically competing on jobs with real budgets, not minor repairs. Knowing the average helps you price bids competitively and understand the caliber of work happening. Most jobs won't be simple handyman work; they'll be substantial renovation or construction that justifies bringing on experienced crews.
How often is MANHATTAN permit data updated?
Permit data is updated daily from public records. New permits are added to the system as they're filed with the city. This means you should check for new filings every day if you want to stay ahead of competition. A permit filed today may have five contractors calling by next week. The contractors who check the data first get first shot at estimating and pitching their services. Daily monitoring is how you build a consistent pipeline of bids.