3,517 other permits filed recently
3,517 permits
Filing herewith for SOE work for new pump station as per the plans submitted herewith.
Filing for 8' high temporary construction fence. this job is in conjunction with alt #q01095467. no change in use, egress, and/or occupancy.
Application to resolve oath/ecb violations: 039160067k, 039160065r and 039160066z of existing three family dwelling. no change in use, egress and occupancy.
Construction equipment- sidewalk- shed proposed installation of heavy duty sidewalk shed. no change in use occupancy or egress under this application, live load 300 # per square feet. sidewalk shed sh...
IRA to assist with Condition Assessment
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycbc.
Replacement of chiller and air handler for the Bank area. No change in use egress and occupancy.
Install 18' drop curb with 1'6 splays on both side.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Propose two story framed building as per plans. Obtain certificate of occupancy for two family dwelling.
Installation of dry/wet sprinkler system as per plans.
Filing for minor structural work as per proposed plans submitted
Filing st for shoring installation. superseding bis job #410075742
General construction plans filed herewith for the approval of existing 6 ft. chain link fence on side yard of property enclosing open parking, tenant egress, and yard and to address OATH/ECB violation...
Installation of construction fence for public protection during construction work
File pl & sp worktype in conjunction with job#q00630735
Installation and use of temporary construction barrier equipment as per plans filed herewith.
NYPQ - Lab 9 - STRUCTURAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Install of heavy duty sidewalk shed as per plans in compliance with chapter 33 of NYCBC. No change in use, eggress or occupancy under this application.