Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy.
Herewith filing soe plans of 2 story alt-1 bldg. the soe involves installation of shoring with timber lagging & 1:1 excavation. this job is filed subsequent to the dob job #q01295506-i1
Interior Renovation of an existing commercial retail space. No changes to use, egress, or occupancy.
Replace existing thru-wall ac unit in Apt 6C. No change to use, egress, or occupancy.
Installation of new plumbing fixtures and piping on all floors including new and replacement of hot water heaters and gas hot water heater.
The project includes the installation of new steel beams to close existing floor openings at the second and third floors. A new non-load-bearing party wall separating building no. 663 from 655 fifth a...
Install 18' drop curb with 1'-6 splays on bothside
General construction work for (4) exterior battery containment enclosures per BB 2025-009. No change to use, egress, or occupancy.
Existing one and a half story, one family dwelling unit to be vertically enlarged, converted into a two family dwelling units , and fully renovated . New drywalls partitions and plumbing fixtures as p...
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building no. 663 from 655 5th...
Mechanical work associated with application#b01359339
Installation of new curb cuts as per plans
Complete repairs of fire-damaged apartment #6H, including 18 fire-damagedroof joists replacement above #6H. No change in use, egress or occupancy.
Installation of new hvac systems & ventilations systems along w/ associated ductwork & piping as indicated on the drawings filed herein.
Job filed herewith of plumbing work for interior renovation of an ex. commercial 2-story structure, incl. new, replaced and relocated plumbing fixtures as per plans. no change in use, egress, or occup...
L-4 CARDIOLOGY Phase 4 : HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Removal of existing sprinkler head and installation of temp loop as per plans filed herewith. No change in use, egress or occupancy under this application .
Erect (4) aluminum storefront cabinets; replacing existing cabinets
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Foundation application being filed for new building.