171,600 permits
Application file for interior renovation work inside the apartment 2A like removal of all the debris and clean the entire apartment, rebuild framing for partition walls, install 1 hour fire rated dryw...
Reach 7-new flood wall constr. for nwbpcr proj. scope involves excavation, grading, landscaping soil improvement. adding & compacting fill to stabilize site w/ erosion cont. stabilizing foundation of...
Reach 7- proposed flood barrier sys. includes i-walls w/ cap/wall, micropile-founded t-/l-walls, closure gates (roller @ 2nd pl, swing @ 3rd, flip-up @ sea), slide-up gates, gravity wall & stair to so...
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or occupancy.
Replacement of sheetrock throughout the cellar, first, and second floor. install the new dunage on the roof for the condensing units. there will be no change in use, occupancy, or egress.
Installation of solar panels on existing roof. no change in use, occupancy, or egress. no change in bulk. work is being paid for under job # x01208892-i1
Sprinkler modifications taking place on the cellar & 1st floor as per drawings filed herewith. no change in use, egress or occupancy.
Plumbing modifications taking place in the cellar as per drawings filed herewith. no change in use, egress or occupancy.
Propose horizontal extension of existing 1 family residential as per plan. No change in use. egress or occupancy under this application.
Modification to Verizon site. Relocate 2 GPS antennas and 1 antenna. Replace 1 antenna, remove 1 antenna, replace 2 RRHs, remove 2 RRHs, install 4 RRHs, install 6 antennas, remove 1 cabinet, install n...
Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO #M01264739 as part of NYC DOB MPP Program. No change in use...
Suspended scaffold outrigger system for exterior inspection
Job filed cap and remove 3-piece bathroom at cellar as per plan to resolve ecb violation#39166094n. no change of use, egress, or occupancy under this application.
Proposed structural, foundation, and earth work for a semi-detached two-family dwelling unit building.
Construction fence associated with DOB Now Filing - B01221746
Chute Installation
Installation, maintenance, and modification of fire protection systems, including new sprinkler heads and standpipe systems. No change to egress, use or occupancy
Interior renovation at cellar on ground lobby, installing new interior ramp, as per plans filed herewith
Soe specifications filed in conjunction with nb application #x01218505-i1.
Installation of a temporary wooden construction fence
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com