Building Permits in ZIP 10002
Manhattan, NY — 525 permits filed recently
525 permits
Direct replacement of (3) condensing units on roof.
Foundation and Earth work
Herewith filing for the installation of mechanical units and related ducts, as per plans submitted.
Initial industrial rope access cd5 fisp. inspection
Modification to existing T-Mobile site. Replace 9 antennas, remove 3 RRH units and install 6 RRH units on roof. Retrofit to existing cabinets on the roof.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2014 building codes, chapter 33. no change in use, egress or occupancy.
Proposed construction of the 8 stories mixed use building with 18 residential units and 2 community facility units
Proposed construction of the 8 stories mixed use building with 18 residential units and 2 community facility units
Interior fitout of store space on the basement floor. Installation of new non-bearing walls. No change to egress, use, or occupancy.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Replace bathroom and kitchen plumbing fixtures in place.
Proposed installation of a temporary heavy duty 300PSF sidewalk shed as per plans submitted. Work shall comply with 2022 building codes, chapter 33. No change in use, egress or occupancy.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Interior renovation of the apartment d1403. no change in use, egress or occupancy.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Replace bathroom and kitchen plumbing fixtures in place.
Proposed installation of a temporary heavy duty 300PSF sidewalk shed as per plans submitted. Work shall comply with 2022 building codes, chapter 33. No change in use, egress or occupancy.