Building Permits in ZIP 10002
Manhattan, NY — 527 permits filed recently
527 permits
Replace bathroom and kitchen plumbing fixtures in place.
Proposed installation of a temporary heavy duty 300PSF sidewalk shed as per plans submitted. Work shall comply with 2022 building codes, chapter 33. No change in use, egress or occupancy.
Interior renovation to an extg ground floor retail space. no change to occupany or egress. all work is considered cosmetic.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Development HUB Initial Consultation completed on 08/02/2022 at 2:00 pm. Erect new residential buildings.
Proposed extension of existing elevator hoistway/bulkhead. no change in use, egress or occupancy.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33, no change in use, egress or occupancy.
Development HUB Initial Consultation completed on 08/02/2022 at 2:00 pm. Erect new residential buildings.
General construction work for (3) exterior battery containment enclosures per BB 2025-009. No change to use, egress, or occupancy. All documents in accordance with BB2025-009 are uploaded in the addit...
Interior renovation to an extg ground floor retail space. no change to occupany or egress. all work is considered cosmetic.
Proposed extension of existing elevator hoistway/bulkhead. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Structural work related to interior renovation of unit 1E
Interior renovation, modify existing closet and new millwork. No change to use, occupancy, or egress.
Installation of pipe scaffold 10 rutgers street, manhattan, ny 10002 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of suspended scaffold for facade inspection/repair.
Herewith filing interior alterations, work to include general construction as per plans submitted. There is no change to use, egress or occupancy under this application.
Recovery of main and bulkhead roofs, balcony repairs, brick replacement, pointing, sill replacement, shelf angle replacement, interior repairs/upgrade as per plans. no change in use, egress or occupan...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Plumbing work as per plans.