Building Permits in ZIP 10002
Manhattan, NY — 527 permits filed recently
527 permits
Installation of suspended scaffold for facade inspection/repair.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Recovery of main and bulkhead roofs, balcony repairs, brick replacement, pointing, sill replacement, shelf angle replacement, interior repairs/upgrade as per plans. no change in use, egress or occupan...
Interior renovation, modify existing closet and new millwork. No change to use, occupancy, or egress.
Structural work related to interior renovation of unit 1E
Herewith filing interior alterations, work to include general construction as per plans submitted. There is no change to use, egress or occupancy under this application.
Plumbing work as per plans.
Installation of pipe scaffold 10 rutgers street, manhattan, ny 10002 as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of concrete column, beam and slab for elevator vertical extension.
To propose plumbing work of existing commercial space on 001 floor as per plan filed herewith. no change of use, egress or certificate of occupancy.
Installation of Rooftop day tank per plans filed.
Installation of concrete column, beam and slab for elevator vertical extension.
To propose plumbing work of existing commercial space on 001 floor as per plan filed herewith. no change of use, egress or certificate of occupancy.
Installation of Rooftop day tank per plans filed.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Replace boiler and gas/oil burner as per plans. no change in use, occupancy or egress.
Installation of temporary construction barriers with chain link fence as per plan. no change in use, egress or occupancy. the construction barriers with chain link fence located in front of building b...
Filing herewith for installation of grease exhaust ventless hood at first floor
Installation of temporary construction barriers with chain link fence as per plan. no change in use, egress or occupancy. the construction barriers with chain link fence located in front of building b...