Building Permits in ZIP 10005
Manhattan, NY — 312 permits filed recently
312 permits
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 25th floor (26th floor marketing) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
General construction modifications taking place on the 8th floor as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical modifications taking place on the 4th floor as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical modifications taking place on the 6th floor as per drawings filed herewith. no change in use, egress or occupancy.
General construction modifications taking place on the 6th floor as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical modifications taking place on the 25th floor (26th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
General construction modifications taking place on the 4th floor as per drawings filed herewith. no change in use, egress or occupancy.
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 25th floor (26th floor marketing) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Exterior window removal and replacement on floors 2 through 17 only. no change in occupancy, use or egress. existing curtain wall system and spandrel glass to remain.
Erect an illuminated business accessory sign in storefront window. no change in use, egress, or occupancy.
Suspended scaffold installation as per plans filed herewith.
Mini crane crane placement. this application involves no change in use occupancy or egress.
Erect a non-illuminated business accessory wall sign. no change in use, egress, or occupancy.
Erect a non-illuminated business accessory wall sign. no change in use, egress, or occupancy.
Erect an illuminated business accessory sign in storefront window. no change in use, egress, or occupancy.
Suspended scaffold installation as per plans filed herewith.
Installation of system stair tower as per plans. system stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of system stair tower as per plans. system stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Modifications to existing mechanical system for suite 2410.
Interior alterations to space 2410, minor partition work, new finishes & fixtures.