Installation of air conditioning units for the Elevator machine room. No change in use egress and occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the pipe scaffold at the northeast elevation from beam system over the equipment to the 35th fl setback and...
Installation of suspended scaffold for facade work or inspection
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress or occupancy
Installation of suspended scaffold for facade work or inspection
Installation of air conditioning units for the Elevator machine room. No change in use egress and occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the pipe scaffold at the northeast elevation from beam system over the equipment to the 35th fl setback and...
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress or occupancy
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 30th floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of a temporary material rigging as per plans during general construction. no change in use, egress or occupancy. material rigging to comply with 2022 nyc building code, chapter 33.
Installation of suspended scaffold for facade work or inspection
Installation of suspended scaffold for facade work or inspection
Installation of a temporary material rigging as per plans during general construction. no change in use, egress or occupancy. material rigging to comply with 2022 nyc building code, chapter 33.
Structural work as shown on the plans.
Structural work as shown on the plans.
Interior demolition in cellar. No change in use, zoning, or egress.
Interior demolition in cellar. No change in use, zoning, or egress.
REMOVAL OF SELECTIVE STRUCTURAL SLABS FROM GROUND LEVEL TO L05 MER.. No change in use, egress or occupancy.
General Construction taking place on the (34th Floor) as per plans filed herewith. No change in Use, Egress or Occupancy.
General Construction taking place on the (33rd Floor) as per plans filed herewith. No change in Use, Egress or Occupancy.