Building Permits in ZIP 10012
Manhattan, NY — 706 permits filed recently
706 permits
Hereby filing the interior renovation fo 10h floor unit including the installation of mechanical equipment. no change to use occupancy or egress.
New variable refrigerant flow heat pump sys. w/ outdoor air cooled condensing unit serving multi indoor air handlers, auto cntls., piping, ductwork, & condensate disposal sys. In-duct steam inj. humid...
Hereby filing the interior renovation fo 10h floor unit including the installation of mechanical equipment. no change to use occupancy or egress.
New variable refrigerant flow heat pump sys. w/ outdoor air cooled condensing unit serving multi indoor air handlers, auto cntls., piping, ductwork, & condensate disposal sys. In-duct steam inj. humid...
Filing for sprinkler interior work for 8th floor space as per plans filed herewith. no change in egress, use or occupancy.
Fit-out of existing space with water heater and plumbing fixtures & modification of existing sprinkler system due to new fit-out of the space.
Proposed plumbing work in conjunction to arch. designs, no change in use, egress and occupancy
Herewith filing for modifications to existing structural system on the 1st, 2nd and roof levels. No change in use, occupancy, or egress.
Herewith filing for removal of existing mechanical systems throughout and installation of new mechanical systems on the cellar, 1st, 2nd & roof levels. No change in use, occupancy, or egress.
General construction for exterior storefront renovations including replace light fixtures and paint the exterior only as per plans filed herewith. no change in use, egress or occupancy.
Renovate suite 308 on 3rd fl. Non bearing partitions and finishes removal. New partitions and finishes. No change in use, egress or occupancy
Connect replacement gas-fired boiler to existing gas as per plans. no change to use, occupancy or egress.
Propose to perform mechanical work. No change in use, egress or occupancy.
Reduction in size of existing loft in 5th floor apartment.
Propose to perform mechanical work. No change in use, egress or occupancy.
Herewith filing for modifications to existing structural system on the 1st, 2nd and roof levels. No change in use, occupancy, or egress.
Renovate suite 308 on 3rd fl. Non bearing partitions and finishes removal. New partitions and finishes. No change in use, egress or occupancy
Reduction in size of existing loft in 5th floor apartment.
Connect replacement gas-fired boiler to existing gas as per plans. no change to use, occupancy or egress.
General construction for exterior storefront renovations including replace light fixtures and paint the exterior only as per plans filed herewith. no change in use, egress or occupancy.