Building Permits in ZIP 10012
Manhattan, NY — 706 permits filed recently
706 permits
Herewith filing for removal of existing mechanical systems throughout and installation of new mechanical systems on the cellar, 1st, 2nd & roof levels. No change in use, occupancy, or egress.
INTERIOR RENOVATION AT EXISTING 2nd FLOOR COMMERCIAL SPACE. NO CHANGE IN USE, OCCUPANCY AND EGRESS. REPLACE EXISTING PLUMBING FIXTURES. REPLACE EXPOSED MECHANICAL METAL DUCTS.
INTERIOR RENOVATION AT EXISTING 2nd FLOOR COMMERCIAL SPACE. NO CHANGE IN USE, OCCUPANCY AND EGRESS. REPLACE EXISTING PLUMBING FIXTURES. REPLACE EXPOSED MECHANICAL METAL DUCTS.
Replace gas-fired boiler as per plans. no change to use, occupancy or egress.
Filing for architectural interior renovations installation of interior non-bearing partitions and related finishes of 8th floor space as per plans filed herewith. no change in egress, use or occupancy...
GC application filed to separate apartments 4F & 5F that were previously combined per TPPN 3/97. Convenience stair to be removed. No change in use, occupancy, or egress.
Hereby filing to install mechanical unit with associated ductwork and piping for lobby renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Standpipe filing to removed cut and capped Auxiliary Fire Hose Cabinet and related serving piping, new Fire Hose Rack to be installed.
New plumbing fixture per plan for existing commercial space. no change in use, occupancy or egress.
Herewith file to renovate exist. apartment unit #5c. work includes new/replace plumbing fixtures with associated plumbing elements, and fire-stopping is provided. no change in use, egress, and occupan...
Hereby filing upgrades to spring street lobby including millwork as shown on plans filed herewith. No change to use, occupancy or egress.
Herewith filing for interior architectural fit out work on the cellar, 1st, 2nd, and roof as indicated on plans. No change in use, occupancy, or egress.
Hereby filing to install mechanical unit with associated ductwork and piping for lobby renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Herewith filing for interior architectural fit out work on the cellar, 1st, 2nd, and roof as indicated on plans. No change in use, occupancy, or egress.
Standpipe filing to removed cut and capped Auxiliary Fire Hose Cabinet and related serving piping, new Fire Hose Rack to be installed.
GC application filed to separate apartments 4F & 5F that were previously combined per TPPN 3/97. Convenience stair to be removed. No change in use, occupancy, or egress.
Herewith file to renovate exist. apartment unit #5c. work includes new/replace plumbing fixtures with associated plumbing elements, and fire-stopping is provided. no change in use, egress, and occupan...
New plumbing fixture per plan for existing commercial space. no change in use, occupancy or egress.
Hereby filing upgrades to spring street lobby including millwork as shown on plans filed herewith. No change to use, occupancy or egress.
Filing for architectural interior renovations installation of interior non-bearing partitions and related finishes of 8th floor space as per plans filed herewith. no change in egress, use or occupancy...