Building Permits in ZIP 10014
Manhattan, NY — 1,093 permits filed recently
1,093 permits
File-supported pipe scaffold as shown on the plan. no change in use, egress, or occupancy under this application.
Installation of sprinkler heads at cellar level.
Plumbing fixture installation at the cellar and first floor.
Installation of construction fence
Installation of heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot perm...
Installation of a temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
It is proposed to create a vanilla box for the new tenant, remove existing partitions, countertop, and plumbing fixtures to be removed under a separate LAA. No change of use, egress or occupancy.
Application filed for structural modifications/additions on the 1st floor & roof. as per plans filed herewith. no change in use, egress, or occupancy.
Scope of work will include interior renovation Assembly , partitions installations flooring finishes , mill work ,doors as indicated on plans. No change in use , egress or Occupancy
plumbing work during interior demolition
Proposed enlargement of an existing 4-story building with basement and cellar. excavated in cellar, horizontal extension in bas and 1st fl. convert multi-fam to 1-fam. interior renovation at bas, cel,...
Plumbing demo work and installation of new plumbing fixtures throughout in existing one family dwelling. All work as per plans submitted.
Non bearing partition and finish removal on 6th fl. No change in use, egress or occupancy
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Air conditioning unit replacement on the second floor MER. No change in use egress and occupancy.
Facade repair/replacement to include masonry, pointing, caulking, lintels, sills, terracotta, and coping stone.
Modification to plumbing fixtures as per plans. no change in use, egress or occupancy.
Interior and exterior renovations as per plans filed herewith, no change in use, egress or occupancy.
This subsequent application is filed for plumbing work for apt 5p on the fifth floor only.
Interior plumbing work in unit 2d2, at 2nd floor, associated with w/ ot application #m01333117-i1. no change in use, occupancy, or egress.