Building Permits in ZIP 10014
Manhattan, NY — 1,093 permits filed recently
1,093 permits
Modification to plumbing fixtures as per plans. no change in use, egress or occupancy.
This subsequent application is filed for plumbing work for apt 5p on the fifth floor only.
Plumbing work related to renovation and enlargement of two existing townhouse. No change to use, egress, or occupancy.
Plumbing demo work and installation of new plumbing fixtures throughout in existing one family dwelling. All work as per plans submitted.
Proposed enlargement of an existing 4-story building with basement and cellar. excavated in cellar, horizontal extension in bas and 1st fl. convert multi-fam to 1-fam. interior renovation at bas, cel,...
Scope of work will include interior renovation Assembly , partitions installations flooring finishes , mill work ,doors as indicated on plans. No change in use , egress or Occupancy
This subsequent application is filed for plumbing work for apt 5p on the fifth floor only.
Pl work filed in conjunction with dob now gc and mh. no change to use, occupancy or egress.
Interior plumbing work in unit 2d2, at 2nd floor, associated with w/ ot application #m01333117-i1. no change in use, occupancy, or egress.
Plumbing demo work and installation of new plumbing fixtures throughout in existing one family dwelling. All work as per plans submitted.
Interior and exterior renovations as per plans filed herewith, no change in use, egress or occupancy.
Miscellaneous facade, roof and terrace restoration as per plans. no change in use, egress or occupancy.
Facade repair/replacement to include masonry, pointing, caulking, lintels, sills, terracotta, and coping stone.
Non bearing partition and finish removal on 6th fl. No change in use, egress or occupancy
Modification to plumbing fixtures as per plans. no change in use, egress or occupancy.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
plumbing work during interior demolition
Combination of apartments 11B & 11C On the 11th floor. remove and construct non-structural partitions. Remove 1 kitchen , modification to lighting fixtures and lighting control . all as per plan. No c...
Plumbing work related to renovation and enlargement of two existing townhouse. No change to use, egress, or occupancy.
Removal and infill of existing convenience stair connecting 1st and 2nd floors