Building Permits in ZIP 10014
Manhattan, NY — 1,109 permits filed recently
1,109 permits
Miscellaneous facade, roof and terrace restoration as per plans. no change in use, egress or occupancy.
This subsequent application is filed for plumbing work for apt 5p on the fifth floor only.
Proposed interior dwelling unit, stair and roof renovation as per plans submitted herewith. there is no change in use, egress or occupancy.
Interior alteration work in apt. 5p on the fifth floor only. no change in egress, occupancy or use under this application.
Install new chimney liner as per plans. no change in use, occupancy or egress.
Proposed interior dwelling unit, stair and roof renovation as per plans submitted herewith. there is no change in use, egress or occupancy.
Installation of temporary 8'-0 wood fence to be removed only after all work is completed.
Structural modifications: Infill slab opening at an existing interior convenience stair on the 7th Floor as per plans (Hines - Demo, Whitebox, Infill.) No change to use, egress or occupancy.
A proposed structural filing in conjunction with alt-co job #: m01285183-i1.
Interior renovation to an existing apartment on the 3rd floor. work to include general construction only, as per plans. no change in use, egress or occupency under this application.
A propoed foundation filing in conjunction with alt-co job #: m01285183-i1.
A proposed structural filing in conjunction with alt-co job #: m01285183-i1.
Installation of temporary 8'-0 wood fence to be removed only after all work is completed.
Conversion of the first and second floors from offices to apartments. work to include interior general construction, as per plans. obtain a new amended co upon completion.
A propoed foundation filing in conjunction with alt-co job #: m01285183-i1.
Interior alteration work in apt. 5p on the fifth floor only. no change in egress, occupancy or use under this application.
Proposed interior dwelling unit, stair and roof renovation as per plans submitted herewith. there is no change in use, egress or occupancy.
Structural modifications: Infill slab opening at an existing interior convenience stair on the 7th Floor as per plans (Hines - Demo, Whitebox, Infill.) No change to use, egress or occupancy.
Interior renovation to an existing apartment on the 3rd floor. work to include general construction only, as per plans. no change in use, egress or occupency under this application.
Removal and installation of interior partitions, flooring, and ceilings. no change in use, egress or occupancy.