Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Removal of (1) existing Fire Hose Rack and Piping back to riser, Install one (1) new valve w/ tamper switch at riser on the 32nd Floor (CO)/ 37th Floor (Marketing) as per plans (LL Work.) No change to...
Plumbing modifications taking place on the 7th floor as indicated on the drawings.
Mechanical changes as indicated on plans; including the installation of (1) Water Cooled Heat Pump.
Ventilation work, duct distribution as per plans filed herewith. No change to use, egress or occupancy.
Installation and use of temporary pipe scaffolding equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Modification/additions to existing supply and return air ductwork, diffusers and transfer ducts. No change in use, egress or occupancy under this application.
Application filed for the conversion and enlargement of existing building.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Removal and installation of non-load bearing partitions, doors, frames, flooring, ceiling and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application...
Facade Repairs
Application filed for the conversion and enlargement of existing building.
Modification/additions to existing supply and return air ductwork, diffusers and transfer ducts. No change in use, egress or occupancy under this application.
Removal and installation of non-load bearing partitions, doors, frames, flooring, ceiling and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application...
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Facade Repairs
Filing to udpate sprinkler head count on the 2nd & 3rd floor as per plans filed. no change to use, egress or occupancy.
General Construction taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
General construction modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.