Building Permits in ZIP 10017
Manhattan, NY — 1,018 permits filed recently
1,018 permits
General construction modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Filing to udpate sprinkler head count on the 2nd & 3rd floor as per plans filed. no change to use, egress or occupancy.
Installation and removal of Sprinkler fixtures along with related piping.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
General Construction taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Condenser water piping and valve replacements from cellar to roof
Filing herewith for Anchor point supports and infills on cellar, 1st-4th & Roof.
Installation of temporary suspended scaffold equipment (material hoist - counterweighted system).
Installation of a temporarily heavy-duty sidewalk, overhead protection and material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ...
Herewith filing for the removal of a single Fire Hose Cabinet (FHC) at the 12th Floor (East Wing), as indicated on the submitted plans. No change in use, egress, or occupancy is proposed.
Application filed accessibility upgrades at entrance ramp on exterior of building along Lexington Avenue
Installation of a temporarily heavy-duty sidewalk, overhead protection and material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occ...
Application filed accessibility upgrades at entrance ramp on exterior of building along Lexington Avenue
Installation of temporary suspended scaffold equipment (material hoist - counterweighted system).
Herewith filing for the removal of a single Fire Hose Cabinet (FHC) at the 12th Floor (East Wing), as indicated on the submitted plans. No change in use, egress, or occupancy is proposed.
Condenser water piping and valve replacements from cellar to roof
Mechanical modifications taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy.
Structural modifications taking place on the 10th floor as per plans filed herewith. No change in use, egress or occupancy.
Interior renovation existing commercial space with plumbing work on 1st floor and mezzaine. no change in use, egress or occupancy.
Architectural modifications taking place on the 16th floor as per plans filed herewith. No change in use, egress or occupancy.