Architectural changes as indicated on plans.
Structural modifications taking place on the Roof as per plans filed herewith. No change in Use, Egress or Occupancy.
Plumbing scope related to amenity renovation at the 8th, No change to use, egress or occupancy.
Modification and installation of plumbing fixtures.
Interior fit-out for existing office space on partial 5th floor and partial 1st floor street lobby. no change to use, egress or occupancy.
Interior fit-out for existing office space on partial 5th floor and partial 1st floor street lobby. no change to use, egress or occupancy.
Modification and installation of plumbing fixtures.
File plumbing work type at apt #19c on 19th floor to replace bathroom/kitchen fixtures, install new washer, convert tub to shower work as per plan. no change in use, egress or occupancy.
Temporary roof protection as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
File plumbing work type at apt #19c on 19th floor to replace bathroom/kitchen fixtures, install new washer, convert tub to shower work as per plan. no change in use, egress or occupancy.
Temporary roof protection as per drawings. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Alterations to the existing curtain wall system at the setback roof terraces. New door assemblies and structural supports integrated into the existing curtain wall system as shown on drawings filed he...
Sprinkler modifications taking place on the 34th floor as per plans filed herewith. No change in use, egress nor occupancy.
9th floor & Roof. Demo. existing exhaust fan at 9th floor window, install condensing unit, and associated fan coil units as per plans.
Exterior work: terra cotta restoration, brick replacement, pointing, new railings installation, roof slab repairs & roof replacement as per plan. no change in use, egress or occupancy.
Sprinkler modifications taking place on the 34th floor as per plans filed herewith. No change in use, egress nor occupancy.
Alterations to the existing curtain wall system at the setback roof terraces. New door assemblies and structural supports integrated into the existing curtain wall system as shown on drawings filed he...
Exterior work: terra cotta restoration, brick replacement, pointing, new railings installation, roof slab repairs & roof replacement as per plan. no change in use, egress or occupancy.
9th floor & Roof. Demo. existing exhaust fan at 9th floor window, install condensing unit, and associated fan coil units as per plans.
Installation of interior non-bearing partitions and related ceilings and finishes, as per drawings filed herewith. no change in orccupany, use or egress.