Building Permits in ZIP 10017
Manhattan, NY — 1,026 permits filed recently
1,026 permits
Modifications to the existing sprinkler system on the 1st floor (LL Work- NW Retail) as per plans. No change to use, egress or occupancy.
Filing new sprinkler work for tenant fit out in existing commercial space as per plans filed herewith. no change to use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of interior non-bearing partitions and related ceilings and finishes, as per drawings filed herewith. no change in orccupany, use or egress.
Exterior restoration as per plans filed herewith. no change to use, egress or occupancy
Low voltage/communication electrical work. install telephone. specific location: 53rd and 54th.
Modifications to the existing sprinkler system on the 1st floor (LL Work- NW Retail) as per plans. No change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per emergency letter. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300ps...
Installation of interior non-bearing partitions and related ceilings and finishes, as per drawings filed herewith. no change in orccupany, use or egress.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Exterior restoration as per plans filed herewith. no change to use, egress or occupancy
Filing new sprinkler work for tenant fit out in existing commercial space as per plans filed herewith. no change to use, egress, or occupancy.
The scope of work includes construction to change the use for a portion of this 3rd floor from business to place of assembly as shown on drawings filed herewith. no change to the bulk of the building.
Filing to remove and demolish (5) existing 60-ton chillers along with all associated piping, and installing (2) new 180-ton modular chiller banks along with all associated piping. no change to use, eg...
Sprinkler scope related to Interior office renovation at the 8th floor, No change to use, egress or occupancy.
Renovation of an existing exterior terrace. Modification of the exterior curtain wall to construct new framed double glass doors.. Construct exterior convenience stair connection on the 8th and 9th fl...
Sprinkler scope related to Interior office renovation at the 20th floor, No change to use, egress or occupancy.
Plumbing scope related to Interior office renovation at the 20th floor, No change to use, egress or occupancy.
Plumbing and sprinkler modification as shown on the drawings. No change to occupancy, use, or egress.
Filing to remove and demolish (5) existing 60-ton chillers along with all associated piping, and installing (2) new 180-ton modular chiller banks along with all associated piping. no change to use, eg...