Building Permits in ZIP 10018
Manhattan, NY — 663 permits filed recently
663 permits
Plumbing work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Installation of temporary betamax material hoist per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Mechanical work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Installation of temporary betamax material hoist per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Mechanical work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Proposed eleven (11) story + cellar mixed-use building. (Cellar, 001-010 construction floors, 11C/PENM)
Installation of temporary p/m cellar hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc building c...
Sprinkler modifications to floors 9 and 10 as per plans filed herewith. No change in use, egress, or occupancy.
Interior renovation of existing office space on the 14th floor; includes installation of interior non-load bearing partitions and finish work as per plans. No change to use, egress or occupancy.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 15th, 16th, 17th, & 18th floors as per plans filed herewith. no change in use, egress, or occupancy...
Sprinkler modifications to floors 9 and 10 as per plans filed herewith. No change in use, egress, or occupancy.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 15th, 16th, 17th, & 18th floors as per plans filed herewith. no change in use, egress, or occupancy...
Interior renovation of existing office space on the 14th floor; includes installation of interior non-load bearing partitions and finish work as per plans. No change to use, egress or occupancy.
Proposed eleven (11) story + cellar mixed-use building. (Cellar, 001-010 construction floors, 11C/PENM)
Installation of temporary p/m cellar hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc building c...
Erect illuminated channel letter sign on receway attached to wall. Jersey Mike's- No change of use, egress or occupancy
Erect illuminated channel letter sign on receway attached to wall. Jersey Mike's- No change of use, egress or occupancy
Filing for facade as per plans. no change in use, egress or occupancy.
Suspended scaffold plans for facade repairs and inspections
INSTALLATION OF 300 PSF SIDEWALK SHED, CONSTRUCTION FENCE, ROOF OF PROTECTION and OHP via Needle Beam AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRE...