Building Permits in ZIP 10018
Manhattan, NY — 663 permits filed recently
663 permits
Sprinkler work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING Haagen - Dazs
Install illuminated led advertising sign (sign a) on wall structure filed under separate application # m01349543. (changeable copy)
Interior mechanical renovation of existing commercial unit on the 14th Floor as per plans. No change to use, occupancy, or egress.
Minor interior demolition. Installation of interior partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor as per plans (Hines - Demo & Whitebox.) No change to use, egress or o...
Filing for the removal of the interior partition work, storage units and the finishes. No change in use, egress or occupancy.
Minor renovation work, enclose elevator lobby and renovate toilets, change in occupancy & use from office space to eating and drinking on the second floor. work in conjunction with application m011261...
Propose to file for mechanical work for two (2) air-cooled packaged units with ductwork. No change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of temporary p/m main hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc building cod...
Installation and use of construction shanties at cellar and first floor levels as per plans filed herewith. This application is filed in conjunction with NB M08018629-I1.
Plumbing work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Suspended Scaffold for Facade Restoration as Shown on Plans
Plumbing modifications to floors 9 & 10 as per plans filed herewith. No change in use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection.
Structural demolition/modifications on Floor 2 and associated shoring on Floors 1 and 2. No change in egress, use or occupancy
Installation of suspended scaffold for facade work or inspection.
Plumbing modifications to floors 9 & 10 as per plans filed herewith. No change in use, egress, or occupancy.
Suspended Scaffold for Facade Restoration as Shown on Plans
Plumbing work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.