Building Permits in ZIP 10018
Manhattan, NY — 665 permits filed recently
665 permits
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Addition and modification to existing sprinkler system on 26 and 27th floors as shown herewith. no changes to egress,occupancy or use.
Modifications to the existing Sprinkler System: Remove (18) sprinkler heads and Install (15) new sprinkler heads and associated Sprinkler Piping on the 7th Floor as per plans (Hines - Demising Wall.)...
Modifications to the existing HVAC System and relocation of ductwork on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy.
Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 7th Floor as per plans (Hines - Demising Wall.) No change to use, egress or occupancy...
Filed herewith for interior removal of non-load bearing walls on the 6th floor to create white box as per plan, no change to use egress or occupancy.
Modifications to the existing plumbing and sprinkler systems on the 4th floor. No change to use, egress, or occupancy.
Installation of heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Conversion of elevator shaft to debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
Propose plumbing work and modification of existing sprinkler system. No change in use, egress or occupancy.
Mechanical work in conjunction with tenant fit out.
Installation and use of temporary loading platform. no change in use, egress or occupancy.
Minor demolition: Removal of interior partitions, walls, doors, suspended ceilings, flooring and finishes on the 21st Floor as per plans (HighLife - Demo Phase.) No change to use, egress or occupancy.
Minor demolition: Removal of interior partitions, walls, doors, suspended ceilings, flooring and finishes on the 21st Floor as per plans (HighLife - Demo Phase.) No change to use, egress or occupancy.
Propose plumbing work and modification of existing sprinkler system. No change in use, egress or occupancy.
Conversion of elevator shaft to debris chute as per plans filed herewith. This application is filed in conjunction with DM M00974121-I1.
Installation and use of temporary loading platform. no change in use, egress or occupancy.
Mechanical work in conjunction with tenant fit out.
Installation of heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Mechanical work in conjunction with tenant fit out.