Building Permits in ZIP 10018
Manhattan, NY — 665 permits filed recently
665 permits
Proposed modification of existing sprinkler system to include relocation, addition and removal of sprinkler heads. no change to use, egress or occupancy
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modifications to the existing plumbing and sprinkler systems on the 4th floor. No change to use, egress, or occupancy.
Plumbing related to interior renovations as shown herewith on drawings. No change to use, egress, or occupancy.
Propose plumbing work and modification of existing sprinkler system. No change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Plumbing related to interior renovations as shown herewith on drawings. No change to use, egress, or occupancy.
Proposed modification of existing sprinkler system to include relocation, addition and removal of sprinkler heads. no change to use, egress or occupancy
Mechanical work in conjunction with tenant fit out.
Modifications to the existing plumbing and sprinkler systems on the 4th floor. No change to use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
Partial and interior demolition of 11 story building as per plans filed herewith.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Structural modifications taking place on 1st fl as per plans filed herewith. no change in use, egress, or occupancy,
mechanical modifications as per plans filed herewith. No change in use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.