Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Filing alt-2 for apt 12b,14a/14b,15a,15-i,that encompasses interior removals and renovations of fire damaged building. the work will include repair and replacement of non-load bearing partitions, no c...
Propose plumbing work of apartment #14C @ partial 14th floor of existing residential building as per plan. No change in use, egress, or occupancy.
Conversion from office (b) occupancy to residential (r-2) occupancy pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law for residential conver...
Architectural modifications to suites 730 and 2410 as per plans. No change to use, egress or occupancy.
Heating/cooling and ventilation for the new perimeter area. Outdoor radiant heating for the new terrace area.
Facade repairs on existing building. no change to use, occupancy or egress.
Structural work on the cellar level as indicated on drawings.
Herewith file plans for the replacement of multi V indoor units and installation of new multi V outdoor units in cellar, 1st floor and 2nd floor roof terrace. No change to use, egress or occupancy. Fi...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work on 4th and 5th floor as per plans filed herewith. no change in use, egress, or occupancy.
Modifications to the Sprinkler system in the Sub-Cellar tenant space (Whole Food Market). No change to occupancy, use or egress.
Elevator machine room roofing membrane replacement (EMR Roof), as per plans. No change to use, egress, or occupancy.
Filing herewith construction fence for egress door work as per plans filed herewith. No change to use, egress or occupancy.
Filing herewith mechanical work as per plans filed herewith. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
filing herewith minor egress change for the 1st FL. retail space as per plans filed herewith. No change to use and occupancy.
Alt-co application filed to convert both towers (north & south) of an existing commercial hotel (ug 5) to ug ii residential. new cofo to be obtained.
Filing to remove internal stair and patching opening(floor slab infill at part of floor 14) as per plans filed. no change to use, egress or occupancy.