Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing herewith construction fence for egress door work as per plans filed herewith. No change to use, egress or occupancy.
Modifications to the Sprinkler system in the Sub-Cellar tenant space (Whole Food Market). No change to occupancy, use or egress.
Filing to remove internal stair and patching opening(floor slab infill at part of floor 14) as per plans filed. no change to use, egress or occupancy.
Elevator machine room roofing membrane replacement (EMR Roof), as per plans. No change to use, egress, or occupancy.
filing herewith minor egress change for the 1st FL. retail space as per plans filed herewith. No change to use and occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 17th floor as per plans. No change to use, egress or occupancy.
Plumbing work for the accessory office bathroom on the first floor as shown in the plans. No change to use, egress or occupancy.
Reinforcement of existing 16th Floor construction for floor finish, new interior partition walls, etc.
Architectural modifications on the 12th floor (Suite 1200) as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Mechanical systems work on the 42nd marketing floor(41st construction floor) as per plans filed. no change to use, egress or occupancy.
Modifications to existing plumbing system in apt. 11G. No change in use, egress, or occupancy.
Modifications to the existing sprinkler system (Amenity Space) as per plans. No change to use, egress or occupancy.
Pulitzer Fountain - plumbing civil work around the fountain plaza.
Modification the existing mechanical system as per plans. No change to use, egress or occupancy
Plumbing work associated with the Pulitzer Fountain renovation. No change of use, egress or occupancy.
Structural modification on the 17-18 floor as per plans. No change to use egress or occupancy.
removal and install new mechanical ductwork and equipment to accommodate tenant renovations on partial 6th floor as per plans filed herewith only.
Suspended Scaffold for Facade Restoration as Shown on Plans