Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Architectural modifications on the 12th floor (Suite 1200) as per plans. No change to use, egress or occupancy.
removal and install new mechanical ductwork and equipment to accommodate tenant renovations on partial 6th floor as per plans filed herewith only.
Interior demolition and installation of new partitions and finishes on partial 6th floor in the existing office building as per plans filed herewith only. No change to zoning, use, egress, or occupanc...
Interior renovation of the 42nd marketing floor/41st construction floor. removal &installation of walls, doors, floor finishes, and ceilings as per plan. the area of work is 3,500 sqft. no change to u...
Structural modification on the 17-18 floor as per plans. No change to use egress or occupancy.
Architectural modifications on the 12th floor (Suite 1200) as per plans. No change to use, egress or occupancy.
Plumbing work for the accessory office bathroom on the first floor as shown in the plans. No change to use, egress or occupancy.
Mechanical systems work on the 42nd marketing floor(41st construction floor) as per plans filed. no change to use, egress or occupancy.
Plumbing work associated with the Pulitzer Fountain renovation. No change of use, egress or occupancy.
removal and install new mechanical ductwork and equipment to accommodate tenant renovations on partial 6th floor as per plans filed herewith only.
Modifications to the existing sprinkler system (Amenity Space) as per plans. No change to use, egress or occupancy.
Chase - mechanical modifications as per plans filed herewith. no change to use, egress or occupancy.
Reinforcement of existing 16th Floor construction for floor finish, new interior partition walls, etc.
Modifications to existing plumbing system in apt. 11G. No change in use, egress, or occupancy.
Pulitzer Fountain - plumbing civil work around the fountain plaza.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
New, multiple dwelling w/ commercial (retail) first floor, building
Filing herewith for extrerior repairs as per drawings. there is no change to use, egress, or occupancy.
At 8th floor apt 8b- interior renovation, removal and installation of non bearing interior partitions and related electrical work.
Replace plumbing fixtures with new at existing roughing (25 lav, 25 wc), cap & remove (25 tubs), and install new plumbing fixtures at new roughing (25 showers) on the 5th floor.