Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Filing pre-build work as per plans filed. no change to use, egress or occupancy.
Plumbing: Modifications to the existing plumbing system on the (23rd Floor- Orrick) as per plans. No change to use, egress or occupancy.
Filing for interior demo of non-load bearing partitions, floors and ceiling as per plans filed. no change to use egress or occupancy.
Installation of temporary debris chute as per plans. no change in use, egress or occupancy.
Modification of existing sprinkler system on the first floor as per plans filed. no change to use egress or occupancy.
Hereby filing for plumbing scope related to the interior renovation. no change to use egress or occupancy.
Mechanical system installation for proposed medical office space as per plans here within. No change it egress, use or occupancy
Interior alteration of apartment 13c with new partitions, finishes, and doors
Herewith filing for interior ms work as per plans filed. no change to use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Replace existing steam fired domestic water heaters with steam fired semi-instantaneous domestic water heater (dwh-1). install replacement dhw supply piping, recirculation pump, dhw recirculation pipi...
Combine apartments 1001 & 1002 as per PPN 3/97. Remove & erect minor interior partitions, remove and replace plumbing fixtures with new, and new finishes. No change in egress occupancy or use.
Associated mechanical work for replacement steam fired semi-instantaneous domestic water heater (dwh-1). install replacement dhw supply piping, recirculation pump, dhw recirculation piping, cold water...
Modification of the existing wet sprinkler system of the commercial business (Club Studio) as shown on plans. No change in use, occupancy or egress
Modification of the existing wet sprinkler system of the commercial business (Club Studio) as shown on plans. No change in use, occupancy or egress
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Combine apartments 1001 & 1002 as per PPN 3/97. Remove & erect minor interior partitions, remove and replace plumbing fixtures with new, and new finishes. No change in egress occupancy or use.
Modification of existing sprinkler system on the first floor as per plans filed. no change to use egress or occupancy.
Mechanical system installation for proposed medical office space as per plans here within. No change it egress, use or occupancy
Herewith filing for interior ms work as per plans filed. no change to use, egress or occupancy.