Combine apartments 1001 & 1002 as per PPN 3/97. Remove & erect minor interior partitions, remove and replace plumbing fixtures with new, and new finishes. No change in egress occupancy or use.
Herewith filing for interior ms work as per plans filed. no change to use, egress or occupancy.
Modification of existing sprinkler system on the first floor as per plans filed. no change to use egress or occupancy.
Mechanical system installation for proposed medical office space as per plans here within. No change it egress, use or occupancy
Associated mechanical work for replacement steam fired semi-instantaneous domestic water heater (dwh-1). install replacement dhw supply piping, recirculation pump, dhw recirculation piping, cold water...
Interior alteration of apartment 13c with new partitions, finishes, and doors
Hereby filing for plumbing scope related to the interior renovation. no change to use egress or occupancy.
Modification of the existing wet sprinkler system of the commercial business (Club Studio) as shown on plans. No change in use, occupancy or egress
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of Battery Charging room for E-bikes in the Sub-Cellar #1 tenant space (Whole Foods Market). No change in occupancy, use or egress.
Connection to base-building supply and duct work distribution. Installation of two water cooled computer room ac unit and one water-cooled ac unit for boardroom.
Installation of Battery Charging room for E-bikes in the Sub-Cellar #1 tenant space (Whole Foods Market). No change in occupancy, use or egress.
Connect to existing gas piping for new gas-fired furnace as per plans. remove existing gas-fired boiler. no change in use, egress or occupancy.
Installation of new partitions, doors, ceilings and finishes on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
demolition related to the renovation of several apartments and the creation of roof terrace. no change of work, egress or occupancy thru this filing.
Install new gas-fired furnace as per plans. install new dehumidifier and fresh air ductwork to mechanical room. remove existing gas-fired boiler. install new chimney liner in existing masonry chimney...
This Alteration application is being filed in conjunction with Alt I application #123112041 for the sprinkler work in floors Cellar, Mez 1, 001-008, Roof level. There are no change in u se, egress or...
Installation of a new HVAC system on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Installation of a temporarily Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing: Modifications to the existing plumbing system on the (16th Floors- Orrick) as per plans. No change to use, egress or occupancy.