Building Permits in ZIP 10019
Manhattan, NY — 1,284 permits filed recently
1,284 permits
Removal and construction of interior partitions, finishes, doors, and ceiling. No change in use, egress or occupancy.
Modifications to the existing HVAC system on the 27th floor as per plans. No change to use, egress or occupancy.
Removal and construction of interior partitions, finishes, doors, and ceiling. No change in use, egress or occupancy.
Installation of a new HVAC system on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Plumbing: Modifications to the existing plumbing system on the (16th Floors- Orrick) as per plans. No change to use, egress or occupancy.
Installation of a temporarily Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of new partitions, doors, ceilings and finishes on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
demolition related to the renovation of several apartments and the creation of roof terrace. no change of work, egress or occupancy thru this filing.
Connect to existing gas piping for new gas-fired furnace as per plans. remove existing gas-fired boiler. no change in use, egress or occupancy.
Modifications to the existing HVAC system on the 27th floor as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st thru 5th floors (Harry Winston) as per plans. No change to use, egress or occupancy.
Mechanical work associated with alteration for proposed restaurant.
Mechanical modifications taking place on sub-cellar #1 (marketing b-2) as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work in 6th floor mechanical room.
Installation of suspended scaffold for facade inspection/repair.
Filing herewith construction fence for egress door work as per plans filed herewith. No change to use, egress or occupancy.
Modifications to the existing plumbing fixtures on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
Interior demo of the existing plumbing fixtures and sprinkler system with temp loop on the 3rd floor as per plans submitted herewith.
Remove & replace existing concrete floor deck with new concrete floor on the metal deck. Remove existing steel framing with new steel framing. Work to be performed at Con Edison's 59th Street Generati...
Proposed work at the apartment 2401 (24th flr) remove non-load bearing partitons, install new partitions for new bathroom, new plumbing work, finishes, lighting as per plans.