Interior demo of the existing plumbing fixtures and sprinkler system with temp loop on the 3rd floor as per plans submitted herewith.
Structural modification on the Cellar & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy.
Modifications to the existing Sprinkler system on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
structural work associated with the scenic pieces installation with the audience for the run of the Broadway Show Back to the Future as shown on plans filed herewith. no change to use, egress or occup...
Remove & replace existing concrete floor deck with new concrete floor on the metal deck. Remove existing steel framing with new steel framing. Work to be performed at Con Edison's 59th Street Generati...
structural work associated with the scenic pieces installation with the audience for the run of the Broadway Show Back to the Future as shown on plans filed herewith. no change to use, egress or occup...
Modifications to the existing Sprinkler system on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Modifications to the existing plumbing fixtures on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
Mechanical work in 6th floor mechanical room.
Structural modification on the Cellar & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy.
Interior demo of the existing plumbing fixtures and sprinkler system with temp loop on the 3rd floor as per plans submitted herewith.
Remove & replace existing concrete floor deck with new concrete floor on the metal deck. Remove existing steel framing with new steel framing. Work to be performed at Con Edison's 59th Street Generati...
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 1st thru 5th floors (Harry Winston) as per plans. No change to use, egress or occupancy.
Installation of suspended scaffold for facade inspection/repair.
Mechanical modifications taking place on sub-cellar #1 (marketing b-2) as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical work associated with alteration for proposed restaurant.
Proposed work at the apartment 2401 (24th flr) remove non-load bearing partitons, install new partitions for new bathroom, new plumbing work, finishes, lighting as per plans.
Combination of apartment 3503 and 3505. Installation of partitions with wall and floor finishes. No change of use, egress or occupancy under this application. Work will comply with TPPN/ 3/97
Modifications to the existing sprinkler and standpipe systems on the 27th floor as per plans. No change to use, egress or occupancy.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.