Demolition of metal stair from 39th to 40th floor. Infill of existing slab openings on 40th floor with new slab construction supported by steel beams. (Area of work approx. 300 square feet. No change...
Stair opening infill on the 28th floor as per plans. No change to use, egress or occupancy.
Removal and disposal of interior partitions, doors, ceilings, finishes and stair on the 27th floor as per plans. No change to use, egress or occupancy.
Demolition of metal stair from 39th to 40th floor. Infill of existing slab openings on 40th floor with new slab construction supported by steel beams. (Area of work approx. 300 square feet. No change...
Relocation and redistribution of existing HVAC and bathroom exhaust systems as per plans filed herewith. No change in use, egress, or occupancy.
General construction modifications taking place on 15th floor (16th Floor marketing) as per drawings filed herewith. No chance in use, egress or occupancy.
Application is filed for interior renovation of existing restaurant space at first floor & mezzanine, as per plans filed. no change to use, egress or occupancyunder this application.
Stair opening infill on the 28th floor as per plans. No change to use, egress or occupancy.
Interior renovation of apt. 44-e on the 44th floor. no change to use, egress, or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or...
Modifications to the existing sprinkler system on the 16th Floor- (Orrick) as per plans. No change to use, egress or occupancy.
Mount sinai west - cpep expansion p1 filing - mechanical modifications as per plans filed herewith. no changes in use, egress, or occupancy.
Mount sinai west - cpep expansion p1 filing - general construction including ceiling, floor, partition and door modifications as per plans filed herewith. no change in use, egress, or occupancy.
Gas connection to replacement gas boilers.
Modifications to the existing sprinkler system on the cellar floor (Harry Winston - Cellar Fit-out) as per plans. No change to use, egress or occupancy
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occup...
General construction work to include alteration of interior finishes & tenant layout. No change of use, egress or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th fl (suite 1109 - nosova) as per plans filed herewith. no change in use, egress, or occupanc...
Modifications to the existing HVAC system on the 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Structural work to include installation of access platform at 6th floor mechanical room.