Building Permits in ZIP 10019
Manhattan, NY — 1,284 permits filed recently
1,284 permits
Structural work filed in conjunction with M01355520-I1 as per drawings filed herewith.
Modifications to the existing Mechanical Systems on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy or Egress.
Modifications to the existing HVAC system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Structural work filed in conjunction with M01355520-I1 as per drawings filed herewith.
Gas connection to replacement gas boilers.
Modifications to the existing HVAC system on the 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Structural work to include installation of access platform at 6th floor mechanical room.
Mount sinai west - cpep expansion p1 filing - mechanical modifications as per plans filed herewith. no changes in use, egress, or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occup...
Modifications to the existing HVAC system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Modifications to the existing sprinkler system on the cellar floor (Harry Winston - Cellar Fit-out) as per plans. No change to use, egress or occupancy
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 11th fl (suite 1109 - nosova) as per plans filed herewith. no change in use, egress, or occupanc...
Mount sinai west - cpep expansion p1 filing - general construction including ceiling, floor, partition and door modifications as per plans filed herewith. no change in use, egress, or occupancy.
Modifications to the existing sprinkler system on the 16th Floor- (Orrick) as per plans. No change to use, egress or occupancy.
General construction work to include alteration of interior finishes & tenant layout. No change of use, egress or occupancy.
Modifications to the existing Mechanical Systems on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy or Egress.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or...
EES will be built around all exposures adjoining the neighbors/sidewalks. It will be installed at the top 3 floors and work its way down floor by floor to the 2nd FL in progression with demolition.
Replace three gas fired boilers.