Building Permits in ZIP 10019
Manhattan, NY — 1,296 permits filed recently
1,296 permits
Application filed for plumbing additions/modifications on the 10th fl (apt 10ij) as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical filing with Emergency Generator as scope of work
General alterations to guestroom suite and corridor on portion of 37th floor (called 38th) as per plans filed herewith. No change in use, egress, or occupancy.
Plumbing work related to the interior renovation of apartment 29-c on the 29th floor. no change in use, egress, or occupancy.
Application filed for plumbing additions/modifications on the 10th fl (apt 10ij) as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing work related to the interior renovation of apartment 29-c on the 29th floor. no change in use, egress, or occupancy.
Mechanical filing with Emergency Generator as scope of work
Roofing System Replacement project. No change in use, egress or occupancy.
Interior Demo to existing 3rd floor office space as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
Modifications to the existing plumbing system on the 36th floor (Suite 3601) as per plans. No change to use, egress or occupancy.
Suspended Scaffold for Facade Restoration as Shown on Plans
General alterations to guestroom suite and corridor on portion of 37th floor (called 38th) as per plans filed herewith. No change in use, egress, or occupancy.
Exterior renovation including new stucco cladding, new storefront infills at the first floor, new signage and new structure as per plans filed herewith. No change to use, egress or occupancy.
General construction taking place on 25th floor construction (26th floor marketing) for change of use - office with accessory exercise room and commercial kitchen
Interior Demo of existing Mechanical Ductwork and related equipment on thr 3rd Floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Modification of existing sprinkler and standpipe system as shown on plans
Plumbing modifications as related to interior renovation. no changes to use, occupancy or egress. scope includes removal of existing appliances & plumbing fixtures, and installation of new appliances...
Facade Repairs as shown in filed drawings. No change in egress, use or occupancy.
Infill of stair opening on 14th and 15th Floors, and removal of interior convenience stair between 13th and 15th Floors