Plumbing work to apartment 7d as per plans filed herewith. no change to use, egress or occupancy.
Modifications to the existing sprinkler system on the Cellar, 3rd & 4th floors (Harry Winston - Office Fit Out) as per plans. No change to use, egress or occupancy.
Equipment use: dual 7000# capacity personnel hoist during bldg alteration, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevat...
Modifications to the existing sprinkler system on the cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Filing demo work as per plans filed. no change to use, egress or occupancy.
Install 11 suspended scaffolds with outriggers. Scaffolds to be used for inspection with 3 people and with 2 people when work is being performed on the facade. Install one additional suspend scaffold...
Facade repair no change in use egress or occupancy
Demolition of existing mechanical equipment associated controls, ductwork and piping
General construction taking place on 37th floor construction (38th floor marketing) as per plans filed hrewith. no change in use, egress, or occupancy.
Plumbing work as shown on plans filed herewith. No Change in use, egress or occupancy.
Erect a non-illuminated business accessory wall sign. no change in use, egress, or occupancy.
Mechanical modifications taking place on 37th floor construction (38th floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Modifications to the existing plumbing system on the 19th floor (Buildout) as per plans. No change to use, egress or occupancy
Modifications to the existing HVAC system on the 1st, Mezz and 2nd floors (Harry Winston - Retail) as per plans. No change to use, egress or occupancy
Sprinkler work to include demolition and installation of temporary loop and plumbing work to include demolition of existing fixtures.
Removal of plumbing fixtures and installation of new sprinkler heads as per plans filed herewith. No change to use, egress, or occupancy.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Installation of temporary plywood enclosure as per plans. no change in use, egress or occupancy.
Sprinkler work for interior fit-out as shown on plans for 13th floor construction (17th floor marketing).
Modifications to the existing plumbing system on the 29th floor (Sapient Capital) as per plans. No change to use, egress or occupancy