Building Permits in ZIP 10020
Manhattan, NY — 166 permits filed recently
166 permits
Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 17-18th Floor as per plans (Lowenstein Sandler LLP - Renovations.) No change to use...
Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 25-26 and 28th Floor as per plans (DLA Piper.) No change to use, egress or occupanc...
Minor interior demolition. Installation of new interior partitions, suspended ceilings, flooring and finishes on the 25-26 and 28th Floor as per plans (DLA Piper.) No change to use, egress or occupanc...
removal of pre-action sprinkler and associated panel.
Sprinkler Head and Temp Loop changes as indicated on plans.
Sprinkler Head and Temp Loop changes as indicated on plans.
removal of pre-action sprinkler and associated panel.
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occupancy.
Installation of temp Tent, platforms, no alt to exist structures for Tony Awards Red Carpet. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production e...
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occupancy.
Installation of temp Tent, platforms, no alt to exist structures for Tony Awards Red Carpet. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All production e...
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in...
Replacement of the terrace doors on 10th floor as per plans. No change to use, egress or occupancy.
Plumbing Fixture changes as indicated on plans.
Mechanical changes as indicated on plans.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Filing herewith plumbing modification and installation of fixtures and associated piping as per plans.