Building Permits in ZIP 10020
Manhattan, NY — 166 permits filed recently
166 permits
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Replacement of the terrace doors on 10th floor as per plans. No change to use, egress or occupancy.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in...
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Plumbing Fixture changes as indicated on plans.
Mechanical changes as indicated on plans.
Filing herewith plumbing modification and installation of fixtures and associated piping as per plans.
Interior demolition and construction of non-load bearing partitions, finishes, fixtures as per plans. No change to use, egress or occupancy.
Structural Modifications: Install new structural steel at existing interconnecting stair to support new glass guardrail between the 17-18th Floors as per plans (Lowenstein Sandler Renovations.) No cha...
Modifications to the existing HVAC System: Install new ductwork, chilled water system, associated insulation, VAVs, (2) CRAH units, (1) Chilled Water FCUs, Condensate Pump/Drain Pans on the 17-18th Fl...
Modifications to the existing HVAC System: Install new ductwork, chilled water system, associated insulation, VAVs, (2) CRAH units, (1) Chilled Water FCUs, Condensate Pump/Drain Pans on the 17-18th Fl...
Structural Modifications: Install new structural steel at existing interconnecting stair to support new glass guardrail between the 17-18th Floors as per plans (Lowenstein Sandler Renovations.) No cha...
Interior demolition and construction of non-load bearing partitions, finishes, fixtures as per plans. No change to use, egress or occupancy.
Sprinkler head changes as indicated on plans.
Plumbing Fixture changes as indicated on plans.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans,
Mechanical changes as indicated on plans.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans,
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.