Building Permits in ZIP 10021
Manhattan, NY — 775 permits filed recently
775 permits
Interior renovation filed in conjunction with dob now pl. no change to use, occupancy or egress.
Combination of apartment 7E and 7F as per TPPN 3/97. Architectural work as per plans. No change of use, occupancy or egress.
Installation of Temporary structure for Mock-up for LPC purposes only.
Register washing machines and dryers. re-pipe sprinkler heads off domestic water supply.
Plumbing for new, relocated, and replaced fixtures in an apartment renovation. no change in use, egress or occupancy.
Heavy duty sidewalk shed related to minor facade repairs. sidewalk shed layout as per plans. no change in use, egress or occupancy under this application. sidewalk shed shall comply with chapter 33 of...
Plumbing for new, relocated, and replaced fixtures in an apartment renovation. no change in use, egress or occupancy.
Heavy duty sidewalk shed related to minor facade repairs. sidewalk shed layout as per plans. no change in use, egress or occupancy under this application. sidewalk shed shall comply with chapter 33 of...
Installation of Temporary structure for Mock-up for LPC purposes only.
Register washing machines and dryers. re-pipe sprinkler heads off domestic water supply.
New high pressure gas service, meter & reducing station. new low pressure gas line, new gas train. new gas fired hot water heater. no change in means of egress use group or occupancy.
INTERIOR MECHANICAL WORK IN EXISTING APT 4B INCLUDING REPLACEMENT OF EXISTING WATER SOURCE HEAT PUMP AHUs AND MODIFICATIONS TO TOILET EXHAUST DUCTWORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Suspended Scaffold installation as per plans filed herewith.
Installation of temporary construction fence at front sidewalk.
INTERIOR MECHANICAL WORK IN EXISTING APT 4B INCLUDING REPLACEMENT OF EXISTING WATER SOURCE HEAT PUMP AHUs AND MODIFICATIONS TO TOILET EXHAUST DUCTWORK. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Suspended Scaffold installation as per plans filed herewith.
Installation of temporary construction fence at front sidewalk.
New high pressure gas service, meter & reducing station. new low pressure gas line, new gas train. new gas fired hot water heater. no change in means of egress use group or occupancy.
Annex esr: structural modifications to accommodate alterations at setback within the existing hopital power building as per plans. no change to use, egress or occupancy.
Annex esr: structural modifications to accommodate alterations at setback within the existing hopital power building as per plans. no change to use, egress or occupancy.