Building Permits in ZIP 10021
Manhattan, NY — 775 permits filed recently
775 permits
Replacement of chiller and pumps as shown on plans.
Install one washing machine
Phase 3a ralph lauren - replacement of existing ducts with new and new diffusers as per plans filed herewith. no change in egress, use or occupancy.
2022 NYC BC Art. 28-104.7: Scope of work: Create a new bedroom by constructing interior non-bearing walls and a door within an existing apartment. No change to use, egress of occupancy.
Minor plumbing work associated with apartment 20a renovation. no change in occupancy use or egress.
Minor plumbing work associated with apartment 20a renovation. no change in occupancy use or egress.
Phase 3a ralph lauren - replacement of existing ducts with new and new diffusers as per plans filed herewith. no change in egress, use or occupancy.
Install one washing machine
2022 NYC BC Art. 28-104.7: Scope of work: Create a new bedroom by constructing interior non-bearing walls and a door within an existing apartment. No change to use, egress of occupancy.
Replacement of chiller and pumps as shown on plans.
Apt. 1E in the cellar: install one (1) exterior condenser and four (4) interior air handlers, two (2) exhaust and one (1) kitchen hood exhaust.
Herewith filing mechanical chiller work as per plans. no change in use, egress or occupancy
Interior renovation of existing apartment 1e in the cellar level of 829 park ave - installation of new non-load bearing partitions, fixtures and finishes. no change in use, occupancy or egress. no ext...
Bridge - extend mechanical ventilation to accommodate the new bridge above a portion of east 71st street which shall connect the existing main hospital building to the new river enlargement. refer to...
Install new 3.5 ton air conditioning split system. no change in use, egress, or occupancy.
Plumbing work to apartment 2f as per plans filed herewith. no change to use, egress or occupancy.
Bridge - extend mechanical ventilation to accommodate the new bridge above a portion of east 71st street which shall connect the existing main hospital building to the new river enlargement. refer to...
Plumbing work to apartment 2f as per plans filed herewith. no change to use, egress or occupancy.
Interior renovation consisting of removal and installation of partitions & doors, renovation of bathrooms and addition of powder room, replacement of kitchen fixtures & finishes, and appliances in apa...
Install new 3.5 ton air conditioning split system. no change in use, egress, or occupancy.