Building Permits in ZIP 10022
Manhattan, NY — 1,627 permits filed recently
1,627 permits
Mechanical modifications to an existing apartment as per plans.
Mechanical demolition on the 17th floor as indicated on drawings.
Modification/addition to sprinkler system and related piping and installation of TCSP as shown on drawings. No change in use, egress or occupancy.
Interior renovaition on 27th floor office space as per plans. no change to use, egress or occupancy.
Plumbing work filed in conjunction with interior renovation & combination of existing aparments as per plans filed. no change in use, egress or occupancy.
Submit emergency generators plan in conjunction with alt-1 application#m01109601-i1.
Non-structural interior buildout (prada) work to include partitions, milwork, finishes, ceiling work as per plans. no change in use egress or occupancy.
Modifications to the existing plumbing system on the 12th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 12th floor as per plans. No change to use, egress or occupancy.
Sprinkler modifications and installation of temporary loop system for 9th floor commercial space as per plans filed herewith.
Interior alteration to existing apt. 6b on the 6th floor. general construction work, demolish and construct non-structural interior partitions, doors, finishes. renovate ex. bathrooms and kitchen. no...
Provide slab infill and support on 7th floor
Brick replacement, lintel replacement, parapet rebuilding, brick corner rebuilding, steel reinforcement, terra cotta replacement, guard rail and railing installation at the bulkhead. no change in use,...
Plumbing modifications for 9th floor commercial space as per plans filed herewith.
Facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
WCM Lobby, Cellar; Plumbing, Sprinkler work to accommodate the Primary Care Renovation in the existing building.
Mechanical work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing modifications for 9th floor commercial space as per plans filed herewith.
Hvac modifications for 9th floor commercial space.