Installation of suspended scaffold for facade work or inspection
Installation of temporary roof protection and overhead protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this ap...
Installation of sprinkler heads as per plans filed. no change to use, egress or occupancy.
Filing for temporary shoring. No change to occupancy, egress, or use.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Convert existing office into residential units on 2nd to 14th floor as per plan. and obtain new c of o.
alterations to existing SP Systems as per plans filed herewith
Interior renovaition on 27th floor office space as per plans. no change to use, egress or occupancy.
Submit emergency generators plan in conjunction with alt-1 application#m01109601-i1.
General construction to include interior renovation and minor demo as per plans
Modification/addition to sprinkler system and related piping and installation of TCSP as shown on drawings. No change in use, egress or occupancy.
Non-structural interior buildout (prada) work to include partitions, milwork, finishes, ceiling work as per plans. no change in use egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Limited Mechanical Upgrades at Apartment 4C including mechanical louver installation to replace existing window. No change to use, egress or occupancy.
WCM Lobby, Cellar; Plumbing, Sprinkler work to accommodate the Primary Care Renovation in the existing building.
Modifications to the existing HVAC system on the 12th floor as per plans. No change to use, egress or occupancy.
Sprinkler modifications and installation of temporary loop system for 9th floor commercial space as per plans filed herewith.
Plumbing modifications for 9th floor commercial space as per plans filed herewith.
Modifications to the existing plumbing system on the 12th floor as per plans. No change to use, egress or occupancy.
Facade repairs as per plans filed herewith. no change to use, egress or occupancy.