alterations to existing SP Systems as per plans filed herewith
Installation of suspended scaffold for facade work or inspection
Filing for temporary shoring. No change to occupancy, egress, or use.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Proposed alteration to the existing apartment #9C to include new bathrooms, kitchen, plumbing, mechanical and electrical work. No change to use, occupancy or egress under this application.
Replacement of hvac system on floor 002 and roof with a total capacity of 7 tons. no change to egress, use, or occupancy.
Installation of temporary roof protection and overhead protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this ap...
Proposed installation of new central air conditioning and heating system throughout apartment, including air handlers, duct work and condensers; installation of exhaust fans. No change to use. occupan...
Installation of hvac and ventilation equipment as per the plans. no change to zoning, use, egress, or occupancy under this application.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Installation of sprinkler heads as per plans filed. no change to use, egress or occupancy.
Proposed installation of new central air conditioning and heating system throughout apartment, including air handlers, duct work and condensers; installation of exhaust fans. No change to use. occupan...
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Structural alterations including new footings to the cellar, 1st floor, and roof, as required for installation of a MRI machine related to architectural application filed under application M0048276.
Installation of hvac and ventilation equipment as per the plans. no change to zoning, use, egress, or occupancy under this application.
alterations to existing SP Systems as per plans filed herewith
Installation of suspended scaffold for facade work or inspection
Convert existing office into residential units on 2nd to 14th floor as per plan. and obtain new c of o.