Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
Partial 15th floor interior work as per plans filed. no change to use, egress or occupancy.
Filing herewith mechanical work as per plans for office renovation.
Combination and interior renovation of 2 existing apartments occupying part of the 10th fl, removal of non-load bearing partitions & finishes as per plans filed herewith. no change to use, egress or o...
Application filed for an office to residential conversion and enlargement to the existing building.
Installation of temporary heavy duty sidewalk shed as per emergency letter. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300ps...
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egress, or occupancy.
plumbing fixture replacement, relocation, installation, removal, no change to use, exits or occupancy
Application filed for structural additions/modifications (slab infill) on the 17th fl (gabriel capital) & partial 18th fl as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
Architectural modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
Installation of rated wall, door and platform in the cellar (Gas Meter Room) as per plans. No change to use, egress or occupancy.
Filing sp for relocation and reinstallation of branch piping and sprinkler heads
Filing pl for the demolition, removal, and reinstallation of existing risers and pl fixtures for bathrooms
Application filed for mechanical additions/modifications on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egress, or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
55th Street Plaza bulkhead roof replacement, as per plans. No change to use, egress, or occupancy.
Installation and use of temporary roof protection equipment as per plans filed herewith. no chance to use, egress or occupancy under this application.
Interior renovation of 9th floor commercial space as per plans filed herewith.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Interior build out of partial floor as shown on drawings. No change in use, egress or occupancy.