Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
Installation and use of temporary roof protection equipment as per plans filed herewith. no chance to use, egress or occupancy under this application.
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
general construction work as per plans filed herewith. No change in use, egress or occupancy.
Application filed for mechanical additions/modifications on the 17th fl (gabriel capital) as per plans filed herewith. no change in use, egress, or occupancy.
Filing pl for the demolition, removal, and reinstallation of existing risers and pl fixtures for bathrooms
Installation of temporary heavy duty sidewalk shed as per emergency letter. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300ps...
Interior renovation of 9th floor commercial space as per plans filed herewith.
Installation of rated wall, door and platform in the cellar (Gas Meter Room) as per plans. No change to use, egress or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Interior build out of partial floor as shown on drawings. No change in use, egress or occupancy.
Mechanical modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
Combination and interior renovation of 2 existing apartments occupying part of the 10th fl, removal of non-load bearing partitions & finishes as per plans filed herewith. no change to use, egress or o...
Architectural modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
plumbing fixture replacement, relocation, installation, removal, no change to use, exits or occupancy
Installation and use of temporary roof protection equipment as per plans filed herewith. no chance to use, egress or occupancy under this application.
general construction work as per plans filed herewith. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment
Filing sp for relocation and reinstallation of branch piping and sprinkler heads