Building Permits in ZIP 10022
Manhattan, NY — 1,616 permits filed recently
1,616 permits
Demising of Existing Retail & Build Out of 655 Fifth Avenue Temporary Retail Store. Scope includes demolition, new doors/partitions, ceilings, finishes, shelving units, millwork, mechanical & electric...
The project includes the installation of new steel beams to close existing floor openings at the second and third floors. A new non-load-bearing party wall separating building no. 663 from 655 fifth a...
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building no. 663 from 655 5th...
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement the removed systems...
Filing herewith plumbing work as per plans. no change in use, egress or occupancy.
Filing herewith sprinkler work as per plans, no change in use, egress or occupancy.
Removal and replacement of roof membrane systems of all roofs as shown on drawings. no change in use, egress or occupancy.
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Sprinkler modifications taking place on the cellar & 1st floor as per drawings filed herewith. no change in use, egress or occupancy.
Plumbing modifications taking place in the cellar as per drawings filed herewith. no change in use, egress or occupancy.
Install an accessory business set of halo lit channel letters with flanged background panel - sign b
Installation of suspended scaffold for facade inspection/repair.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Partially demolish existing mechanical systems, ductwork, piping, equipment, etc. furnish and install new mechanical piping and valves, accessories, etc. provide all mechanical services, materials, et...
Facade and roof restoration as indicated on plans filed herewith. no change in use, egress or occupancy.
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 18th floor (Derby Lane) as per plans. No change to use, egress or occupancy.
New alt2 application for general construction work to be performed in existing unit 1C on the bas, 1st, and 2nd floors. Subsequent plumbing application to be filed. All per plans. No changes to use eg...
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Interior renovation of existing retail store to deli store. Remove and install partition walls, refrigeration units, exhaust system, finishing floor, walls and ceiling as per plans. No change in egres...
Sprinkler modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.