Building Permits in ZIP 10022
Manhattan, NY — 1,616 permits filed recently
1,616 permits
Interior renovation of existing retail store to deli store. Remove and install plumbing fixtures as per plans. No change in egress, occupancy or use is involved under this application.
Installation of plumbing fixtures for medical office as per plans filed herewith. No change in use, egress or occupancy under this application.
(cellar/ 1st/ 2nd/3rd floor) replace / install plumbing fixtures-as per plans -no change to egress use
Corridor and bathroom modifications
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Plumbing modification in existing residential units as per plan.
Removal of sprinkler heads; install temporary sprinkler loop on the 20th floor as indicated on drawings.
Plumbing modification in existing residential units as per plan.
Installation of plumbing fixtures for medical office as per plans filed herewith. No change in use, egress or occupancy under this application.
Corridor and bathroom modifications
Removal of sprinkler heads; install temporary sprinkler loop on the 20th floor as indicated on drawings.
New alt2 application for general construction work to be performed in existing unit 1C on the bas, 1st, and 2nd floors. Subsequent plumbing application to be filed. All per plans. No changes to use eg...
Modifications to the existing HVAC system on the 14th & 15th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Interior renovation of existing retail store to deli store. Remove and install partition walls, refrigeration units, exhaust system, finishing floor, walls and ceiling as per plans. No change in egres...
Sprinkler modifications taking place on the 14th floor as per plans filed herewith. No change in use, egress or occupancy.
Interior renovation of existing retail store to deli store. Remove and install plumbing fixtures as per plans. No change in egress, occupancy or use is involved under this application.
(cellar/ 1st/ 2nd/3rd floor) replace / install plumbing fixtures-as per plans -no change to egress use
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 18th floor (Derby Lane) as per plans. No change to use, egress or occupancy.
General construction for limited exterior repairs at all facades as per plans filed herewith. no change in use, egress or occupancy.
Modification/addition to sprinkler system and related piping and installation of temporary core sprinkler protection as shown on drawings. No change in use, egress or occupancy.