Building Permits in ZIP 10022
Manhattan, NY — 1,617 permits filed recently
1,617 permits
Interior office renovation on 4th floor as per plans.
Installation of suspended scaffold for facade work or inspection.
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Existing 14 stories with penthouse rediential fireproof steel building. proposed to replace existing staircase at penthouse c as per plan
Sprinkler modifications taking place on the 16th & 17th floor as per plans filed herewith. No change in use, egress, or occupancy.
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
Mechanical work associated with associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or occupancy
structural work associated with the Interior renovation of the duplex apartment, associated with the convenience stair reconstruction as shown on the plans file herewith. No change to use, egress or o...
Interior office renovation on 4th floor as per plans.
Installation of new non-load bearing walls, doors, wall and floor finishes, ceilings, and millwork and removal of floor finishes on 20th floor office space as per plans. no change to use, egress or oc...
Plumbing work file in conjunction with duplex apartment #3E renovation.
Facade and exterior repairs as per drawings. No change in use, egress or occupancy is involved under this application.
Existing 14 stories with penthouse rediential fireproof steel building. proposed to replace existing staircase at penthouse c as per plan
Plumbing work filed in conjunction with interior renovation @ partial 2nd & 3rd floor plan(apts. #2bc ,3b & 3d). no change in use, egress or occupancy.
Structural modifications taking place in the cellar and on the 1st and 2nd floors per drawings filed herewith. no change in use, egress or occupancy.
Removal of existing sprinkler and installation of temporary sprinkler loop on 20th floor as per drawings. no change to use, egress or occupancy.
Sprinkler work for tenant Slarskey on 32nd marketing floor (31st construction)
Installation of suspended scaffold for facade work or inspection.
Proposed garage repairs as indicated on plans submitted herewith. there is no change in use, egress or occupancy.